Enter the amount of work completed and the total work required into the calculator to determine the job completion percentage.

Job Percentage Formula

The following formula is used to calculate the job completion percentage.

JP = (C / T) * 100

Variables:

  • J% is the job completion percentage
  • C is the work completed (units)
  • T is the total work required (units)

To calculate the job completion percentage, divide the work completed by the total work required and then multiply by 100 to convert it to a percentage.

What is Job Completion Percentage?

Job completion percentage is a measure of the progress made on a job or project, expressed as a percentage. It represents the ratio of work completed to the total work required. This metric is commonly used in project management to track the status of tasks and to estimate the time and resources needed to complete a project.

How to Calculate Job Completion Percentage?

The following steps outline how to calculate the Job Completion Percentage.


  1. First, determine the work completed (C) in units.
  2. Next, determine the total work required (T) in units.
  3. Next, gather the formula from above = J% = (C / T) * 100.
  4. Finally, calculate the Job Completion Percentage (J%).
  5. After inserting the variables and calculating the result, check your answer with the calculator above.

Example Problem : 

Use the following variables as an example problem to test your knowledge.

work completed (C) = 150 units

total work required (T) = 200 units