Calculate progress percentage, or percent complete toward a goal, from the amount done and the total, plus the percentage and amount remaining.

For a decreasing goal (e.g. weight loss), add its starting value under Nonzero starting point.

All amounts must use the same unit. Changing this label does not convert values.

Nonzero starting point
Blank means zero. A decreasing goal must differ from its starting value.


Related Calculators

Calculator Functions

FunctionWhat it doesWhat it requires
Progress percentageFinds the percentage of a goal that is completeRequires the current or completed amount and the goal
Amount at a target percentageFinds the amount that matches a percentage of a goalRequires the goal and the progress percentage
Total goal from progressFinds the full goal when a completed amount and its percentage are knownRequires the completed amount and the progress percentage
Progress versus scheduleCompares the work done with the time used, and projects a finish dateRequires the completed amount, the goal, the start date, the target end date and the date of the progress figure

A quantity label of units, tasks, pages, hours, items, dollars, miles or words is added to the results. It is only a label, so every amount has to be in the same unit. The Progress percentage function has an optional starting value for a goal that does not start from zero. The result includes a progress bar, which stops at 100%.

Progress Percentage Formulas

P = (C โˆ’ S) รท (G โˆ’ S) ร— 100
PProgress (%)
CCurrent or completed amount
GGoal or total amount
SStarting value, zero when left blank

With no starting value this is simply P = C รท G ร— 100. Every result also shows the amount remaining and the percentage remaining.

Progress percentage

The main formula applies directly. 45 of 90 tasks is 45 รท 90 ร— 100 = 50%. A starting value handles a goal that counts down: going from 200 lb toward 170 lb, a current weight of 185 lb is (185 โˆ’ 200) รท (170 โˆ’ 200) ร— 100 = 50%. A result under 0% means movement away from the goal, and a result over 100% means the goal has been passed.

Amount at a target percentage

C = G ร— P รท 100

40% of a 250 page goal is 100 pages.

Total goal from progress

G = C รท (P รท 100)

30 hours that make up 25% of a job put the whole job at 120 hours.

Progress versus schedule

Variance = P โˆ’ T

T is the share of the schedule already used, elapsed days รท scheduled days ร— 100. A variance above zero is ahead of a straight-line schedule and below zero is behind it. Within 1 percentage point either way is reported as on schedule.

Finish = date + R รท pace

Pace is the completed amount รท elapsed days, R is the amount remaining, and the number of days is rounded up. The result also gives the pace needed to finish on the target date, which is R รท the days left. With 40 of 100 units done 30 days into a 100 day schedule, progress is 40% against 30% of the time, 10 points ahead. The pace is 1.3333 units a day, so the remaining 60 units take 45 more days, and the required pace is 60 รท 70 = 0.8571 units a day.

Limits of This Estimate

  • Progress by amount treats every unit as equal work. Ten tasks of very different sizes are better tracked in hours.
  • The schedule function counts calendar days, with no allowance for weekends or holidays.
  • The projected finish assumes the average pace so far continues. It is a planning figure, not a completion date.