Calculate progress percentage, or percent complete toward a goal, from the amount done and the total, plus the percentage and amount remaining.
Related Calculators
- Target vs Achievement Percentage Calculator
- Success Percentage Calculator
- Part Base Rate Calculator
- Fall Percentage Calculator
- All Math and Numbers Calculators
Calculator Functions
| Function | What it does | What it requires |
|---|---|---|
| Progress percentage | Finds the percentage of a goal that is complete | Requires the current or completed amount and the goal |
| Amount at a target percentage | Finds the amount that matches a percentage of a goal | Requires the goal and the progress percentage |
| Total goal from progress | Finds the full goal when a completed amount and its percentage are known | Requires the completed amount and the progress percentage |
| Progress versus schedule | Compares the work done with the time used, and projects a finish date | Requires the completed amount, the goal, the start date, the target end date and the date of the progress figure |
A quantity label of units, tasks, pages, hours, items, dollars, miles or words is added to the results. It is only a label, so every amount has to be in the same unit. The Progress percentage function has an optional starting value for a goal that does not start from zero. The result includes a progress bar, which stops at 100%.
Progress Percentage Formulas
| P | Progress (%) |
| C | Current or completed amount |
| G | Goal or total amount |
| S | Starting value, zero when left blank |
With no starting value this is simply P = C รท G ร 100. Every result also shows the amount remaining and the percentage remaining.
Progress percentage
The main formula applies directly. 45 of 90 tasks is 45 รท 90 ร 100 = 50%. A starting value handles a goal that counts down: going from 200 lb toward 170 lb, a current weight of 185 lb is (185 โ 200) รท (170 โ 200) ร 100 = 50%. A result under 0% means movement away from the goal, and a result over 100% means the goal has been passed.
Amount at a target percentage
40% of a 250 page goal is 100 pages.
Total goal from progress
30 hours that make up 25% of a job put the whole job at 120 hours.
Progress versus schedule
T is the share of the schedule already used, elapsed days รท scheduled days ร 100. A variance above zero is ahead of a straight-line schedule and below zero is behind it. Within 1 percentage point either way is reported as on schedule.
Pace is the completed amount รท elapsed days, R is the amount remaining, and the number of days is rounded up. The result also gives the pace needed to finish on the target date, which is R รท the days left. With 40 of 100 units done 30 days into a 100 day schedule, progress is 40% against 30% of the time, 10 points ahead. The pace is 1.3333 units a day, so the remaining 60 units take 45 more days, and the required pace is 60 รท 70 = 0.8571 units a day.
Limits of This Estimate
- Progress by amount treats every unit as equal work. Ten tasks of very different sizes are better tracked in hours.
- The schedule function counts calendar days, with no allowance for weekends or holidays.
- The projected finish assumes the average pace so far continues. It is a planning figure, not a completion date.