Estimate pole barn materials from the building size: posts, trusses, girts, purlins and metal roof and wall panels, with common spacings preset.

The gable end, which the trusses span.

Ground to the top of the sidewall.

Trusses that sit directly on the posts use the post spacing.

Roof, girts and panels (typical values)

Used on the eaves and the gable ends. Enter 0 for none.

24 in on center is typical under metal roofing.

24 in on center is typical. Some designs call for 20 in.

Most ribbed steel panels cover 36 in.

Calculator Functions

The calculator turns the size of a rectangular, gable-roofed pole barn into a material list: posts, trusses, wall girts, skirt board, roof purlins, metal roof and wall panels, roof and wall areas, and ridge cap length.

FunctionUse it whenYou enter
Material estimateYou are planning or pricing a post-frame building and need quantitiesBuilding length, width and eave height, plus post and truss spacing

Post spacing starts at 8 ft and truss spacing at 4 ft. The optional settings start at a 4/12 roof pitch, a 1 ft overhang, purlins and girts 24 in apart and panels that cover 36 in. These are common values for this kind of building [1][2], and each can be changed to match your plans.

Pole Barn Material Formulas

Posts = 2 × (BL + BW)
BLBays along each sidewall: building length ÷ post spacing, rounded up
BWBays along each endwall: building width ÷ post spacing, rounded up

Posts are spread evenly along each wall so that no gap is wider than the spacing you chose, and each corner post is counted once. Only the outside walls are counted.

Trusses

T = L ÷ St + 1

T is the number of trusses, L the building length and St the truss spacing. L ÷ St is rounded up to a whole number first, and the extra one is the truss at the far end. Post-frame trusses are usually 4 ft or more apart, and when they sit directly on the posts they follow the post spacing, often 8 ft [2].

Roof slope length and purlins

R = (W ÷ 2 + O) ×
√(1 + (P ÷ 12)²)
Np = R ÷ Sp + 1

R is the length of one roof slope from eave edge to ridge, W the building width, O the overhang and P the pitch in inches of rise per 12 in of run. Np is the number of purlin rows on each side, with R ÷ Sp rounded up first, and Sp is the purlin spacing in the same unit as R. Each row runs the full roof length, L + 2 × O, on both sides of the roof.

Wall girts and skirt board

Ng = H ÷ Sg
Fg = Ng × 2 × (L + W)

Ng is the number of girt rows, rounded up to a whole number, H the eave height and Sg the girt spacing in the same unit. Fg is the total girt length. The treated skirt board at the bottom of the wall is listed separately and runs once around the building, 2 × (L + W).

Metal panels and areas

Nr = 2 × (L + 2 × O) ÷ C
Nw = 2 × (L + W) ÷ C
Ar = 2 × R × (L + 2 × O)
Aw = 2 × (L + W) × H
+ W × G

Nr and Nw are the roof and wall panel counts, and Ar and Aw the roof and wall areas. C is the width one panel covers. Each side of the roof and the wall perimeter are rounded up to whole panels. Roof panels are R long. G is the gable rise, W ÷ 2 × P ÷ 12, so W × G is the area of the two gable triangles. Use the roof area in the Metal Roof Screw Calculator to count fasteners.

Limits of This Estimate

  • These are counts for planning and pricing, not a structural design. Post, truss, girt and purlin sizes and spacings depend on snow load, wind load and soil, so the final numbers come from engineered plans or your local building code. These estimates are based on the best available data and estimations.
  • Nothing is taken off for doors and windows, and nothing is added for waste, trim, door framing, bracing, fasteners or concrete. The Pole Barn Post Calculator covers post length and concrete per hole.
  • The wall panel count covers the perimeter once. Endwall panels have to be longer than the eave height to reach the roof line, so order those to the gable height.
  • It assumes a plain rectangle with a symmetrical gable roof and no interior posts, lean-tos or porches.

Sources

  1. USDA Natural Resources Conservation Service, Design Guide 12, Prescriptive Design Specifications for Non-Diaphragm Post-Frame Buildings: a standard post-frame layout with 8 ft column spacing, 4 ft truss spacing, purlins 2 ft apart, a 4:12 roof, a treated skirt board and steel panels with 36 in coverage