Compare actual and positive planned dollar results for the same period. Choose pacing to goal (%), actual result, or planned result, enter the required values, and select Calculate.

Compare actual and planned results for the same period. Planned results must be positive.

Negative results are allowed.


Related Calculators

Pacing to Goal Formula

The following two example problems outline the steps and information needed to calculate the Pacing to Goal.

P = ((AR - PR) / PR) ร— 100

Variables:

  • P is the pacing to goal percentage (variance from plan)
  • AR is the actual result ($) 
  • PR is the planned result ($) 

To calculate pacing to goal (%), subtract planned from actual, divide by the positive planned result, then multiply by 100. Zero means actual equals plan; negative means below plan. Use results from the same period.

Actual + Planned to Pacing to Goal (%) Conversion Table (Example uses Planned Result = $1,000)
Actual Result ($) Planned Result ($) Pacing to Goal (%)
5001,000-50.00
6001,000-40.00
7001,000-30.00
7501,000-25.00
8001,000-20.00
8501,000-15.00
9001,000-10.00
9501,000-5.00
1,0001,0000.00
1,0501,0005.00
1,1001,00010.00
1,1501,00015.00
1,2001,00020.00
1,2501,00025.00
1,3001,00030.00
1,4001,00040.00
1,5001,00050.00
1,7501,00075.00
2,0001,000100.00
2,5001,000150.00
Formula: Pacing to Goal (%) = ((Actual โˆ’ Planned) / Planned) ร— 100. Values above assume Planned Result = $1,000.

How to Calculate Pacing to Goal?

The following steps outline how to calculate the Pacing to Goal.


  1. First, determine the actual result ($). 
  2. Next, determine the planned result ($). 
  3. Next, gather the formula from above = P = ((AR – PR) / PR) ร— 100.
  4. Finally, calculate the Pacing to Goal.
  5. After inserting the variables and calculating the result, check your answer with the calculator above.

Example Problem : 

Use the following variables as an example problem to test your knowledge.

actual result ($) = 3000

planned result ($) = 2000

P = ((3000 – 2000) / 2000) ร— 100 = 50%. The actual result is 50% above plan.